Short answer: log each shift per machine with planned production time, downtime minutes by reason, ideal cycle time, total count and good count. Then Availability = (planned − downtime) ÷ planned, Performance = ideal cycle × total count ÷ run time, Quality = good ÷ total, and OEE = A × P × Q. Aggregate by summing the inputs, not averaging percentages, and chart downtime reasons as a Pareto. For shop-floor data entry and history, see our manufacturing database in Access.

OEE is the most widely used measure of how well a machine or line is used, and one of the most often miscalculated. The formula is simple; the mistakes come from inconsistent definitions, averaging percentages across shifts, and downtime that is recorded as a total with no reason. A structured Excel log fixes all three and turns OEE from a number on a wall into a list of problems to solve.

The Production Log

ColumnExampleNotes
Date, Shift, Line/Machine2026-11-03, B, Press 4One row per machine per shift
ShiftMinutes480Total shift length
PlannedStops30Breaks, planned maintenance, no-demand time
PlannedTime=ShiftMinutes − PlannedStopsBasis for OEE
DowntimeMinutesSum from the downtime logUnplanned stops, changeovers
IdealCycleSec12Per part, from the product master
TotalCount, GoodCount1,950, 1,890From counters or the operator
ProductBracket 220Ideal cycle differs by product

Keep downtime in its own log with machine, shift, start, minutes, reason category and a short note. The shift row sums it with SUMIFS. That separation is what makes reason analysis possible.

The Formulas

RunTime (minutes):
=[@PlannedTime] - [@DowntimeMinutes]

Availability:
=IF([@PlannedTime] = 0, "", [@RunTime] / [@PlannedTime])

Performance (cap at 100%; above means the ideal cycle is wrong):
=IF([@RunTime] = 0, "", MIN(1, ([@IdealCycleSec] * [@TotalCount] / 60) / [@RunTime]))

Quality:
=IF([@TotalCount] = 0, "", [@GoodCount] / [@TotalCount])

OEE:
=IFERROR([@Availability] * [@Performance] * [@Quality], "")

If Performance regularly exceeds 100 percent, the ideal cycle time is set too slow. Correct it at the source rather than relying on the MIN cap, which only hides the problem.

Aggregating Correctly

Never average OEE percentages across shifts or machines. A short shift at 90 percent and a full shift at 50 percent do not average to 70. Sum the inputs and recalculate.

Weekly OEE for a line (line in A2, week start in B1):
=LET(
  pt,  SUMIFS(tblLog[PlannedTime], tblLog[Line], A2, tblLog[Date], ">=" & B1, tblLog[Date], "<" & B1 + 7),
  rt,  SUMIFS(tblLog[RunTime],     tblLog[Line], A2, tblLog[Date], ">=" & B1, tblLog[Date], "<" & B1 + 7),
  ideal, SUMPRODUCT((tblLog[Line]=A2) * (tblLog[Date]>=B1) * (tblLog[Date]<B1+7),
                    tblLog[IdealCycleSec] * tblLog[TotalCount]) / 60,
  tot, SUMIFS(tblLog[TotalCount],  tblLog[Line], A2, tblLog[Date], ">=" & B1, tblLog[Date], "<" & B1 + 7),
  good,SUMIFS(tblLog[GoodCount],   tblLog[Line], A2, tblLog[Date], ">=" & B1, tblLog[Date], "<" & B1 + 7),
  (rt / pt) * (ideal / rt) * (good / tot))

The Six Big Losses

LossOEE factorExample reason codes
BreakdownsAvailabilityMechanical failure, electrical, tooling break
Setup and changeoversAvailabilityProduct change, die change, cleaning between runs
Minor stopsPerformanceJams, sensor trips, material feed
Reduced speedPerformanceRunning below rated speed, worn tooling
Startup rejectsQualityScrap while warming up after changeover
Production rejectsQualityScrap and rework during steady running

Use a short, fixed list of reason codes mapped to these categories. Operators choosing from 8 to 15 reasons is realistic; 60 reasons produces "Other".

Downtime Pareto

Minutes by reason this month (spills sorted, highest first):
=SORTBY(UNIQUE(tblDowntime[Reason]),
        SUMIFS(tblDowntime[Minutes], tblDowntime[Reason], UNIQUE(tblDowntime[Reason]),
               tblDowntime[Date], ">=" & EOMONTH(TODAY(), -1) + 1), -1)

Chart the result as a Pareto (bars plus cumulative percentage line). Usually two or three reasons account for most of the lost minutes; those are the improvement projects.

Data Collection That Operators Accept

  • A simple tablet or PC form per machine: shift start, counts, downtime events with a reason dropdown.

  • Record downtime as it happens, not reconstructed at shift end.

  • Machine counters or PLC data where available, so counts are not typed.

  • Show the operator their shift's OEE at the end of the shift; feedback improves data quality.

Excel is fine for analysis but weak for simultaneous shop-floor entry from many stations. That is where an Access front end with a shared back end works better; see our manufacturing database in Access and Access ERP.

Where AI Helps

  • Classify free-text downtime notes into your reason codes for older data.

  • Summarise the week: biggest losses, changes from last week, lines to watch.

  • Spot patterns across shifts, products and operators for the engineer to investigate.

Weekly narrative generation follows the approach in automating report commentary with AI. Quality losses link to the nonconformance (NCR) log. For a live dashboard refreshed from shop-floor data, see Excel dashboards and BI reporting.

FAQ

OEE calculation FAQ

Formulas, definitions and benchmarks

Overall Equipment Effectiveness (OEE) measures how much of planned production time is truly productive. It is the product of three factors: Availability (running time ÷ planned production time), Performance (actual output speed ÷ ideal speed) and Quality (good parts ÷ total parts).

Availability = (Planned time − Downtime) ÷ Planned time. Performance = (Ideal cycle time × Total count) ÷ Run time. Quality = Good count ÷ Total count. OEE = Availability × Performance × Quality. In Excel, put each input in a column per shift or day and calculate the three factors and their product.

Commonly cited benchmarks put world-class discrete manufacturing OEE around 85 percent, with many plants operating well below that. Your own trend matters more than a benchmark: a line improving from 52 to 61 percent is a real gain.

In standard OEE, planned stops such as scheduled breaks and planned maintenance are removed from planned production time rather than counted as downtime. Some plants track a separate TEEP measure that includes all calendar time. Define it once and keep it consistent.

Different definitions of planned time, ideal cycle time and what counts as downtime. A plant using an optimistic ideal cycle time will show low performance; one excluding changeovers from planned time will show high availability. Comparisons are only meaningful with identical definitions.